A multi-channel retailer with about $120M in revenue had fragmented freight contracts and no unified view of inventory. Armstrat restructured the supply chain around both and saw the work through implementation. Freight cost fell 18%.

Client
A multi-channel retailer with about $120M in revenue, selling across six channels
Engagement
Supply chain restructure covering freight contracts and inventory visibility, carried through implementation
Result
18% lower freight cost and $280K in annualized savings within six months of implementation
How we worked
Embedded with the retailer through implementation, with the work judged on freight cost and savings in operation

Published . Client name withheld.

18%reduction in freight cost

The situation

The retailer had grown to about $120M in revenue and was selling across six channels. Its supply chain had not kept pace with that growth. Freight ran on fragmented contracts, and the business had no unified view of its inventory.

The more the retailer grew, the heavier the operational drag became, and it compounded at every layer of the operation. The question was not where the drag showed up, but what sat underneath it.

What made it hard

  • Freight ran on fragmented contracts, so there was no single structure behind what the retailer paid to move goods.
  • There was no unified view of inventory, which left the business without one picture of what it held.
  • Selling across six channels, the retailer felt the operational drag at every layer, and it compounded as the business scaled.
  • The changes had to be carried into daily operations, not stop at a recommendation.
A courier carrying two cardboard boxes.

How we worked

Armstrat worked inside the retailer rather than advising from outside. It restructured the supply chain around two root problems and stayed through implementation, until the new structure was running. The engagement was judged on results in operation, freight cost and savings, and both had moved within six months of implementation.

  1. 01

    Find the root problems

    Rather than treating the drag layer by layer, Armstrat traced it back to two root problems: fragmented freight contracts and the lack of a unified inventory view. Those two problems set the scope of the restructure and kept the work focused on causes, not symptoms.

  2. 02

    Restructure the freight contracts

    Armstrat restructured the retailer’s fragmented freight contracts, the part of the supply chain that sets what the business pays to move goods. This was the work most directly tied to the freight cost result, and it addressed the first of the two root problems.

  3. 03

    Address the missing inventory view

    In the same restructure, Armstrat took on the second root problem, the absence of a unified view of inventory. For a business selling across six channels, the aim was one view of inventory, treated as part of the supply chain fix rather than as a separate project.

  4. 04

    Stay through implementation

    Armstrat carried the work through implementation rather than handing over a plan and leaving. Staying embedded until the changes were running meant the results could be judged in the business itself, and the freight and savings figures came within six months.

The results

Measured against the outcomes agreed at the start.

18%
  • Cut freight cost by 18%.
  • Delivered $280K in annualized savings within six months of implementation.
  • Restructured the supply chain around its two root problems, the fragmented freight contracts and the missing inventory view, instead of treating symptoms one layer at a time.
  • Carried the work through implementation, so the savings came from changes in operation, not from a plan on paper.

What leaders can take from it

  • When operational drag shows up at every layer, look for the few root problems underneath it. This restructure was organized around two of them, freight contracts and inventory visibility, rather than a long list of symptoms.
  • Fragmented freight contracts are easy to overlook when each one is reviewed on its own. Looking at them as a whole and restructuring them was central to cutting this retailer’s freight cost by 18%.
  • A recommendation on its own does not lower freight cost. Results like these come from carrying the change through implementation and then measuring it in the business, here within six months.

Questions about this work

How did a $120M retailer cut freight cost by 18%?

By restructuring its supply chain around two root problems: fragmented freight contracts and no unified view of inventory. The retailer sold across six channels and the operational drag compounded as it scaled. Armstrat restructured both areas and carried the work through implementation. Freight cost fell 18%, with $280K in annualized savings within six months of implementation.

What does a supply chain restructure for a multi-channel retailer involve?

It starts with finding the root problems behind the drag, not treating each symptom where it appears. For this retailer there were two: fragmented freight contracts and the missing inventory view. Armstrat restructured the supply chain around both and stayed through implementation, so the outcome was judged in operation: 18% lower freight cost and $280K in annualized savings.